New production facility

Category
Design, HVAC, Process, Qualification
About This Project
Client: Confidential
Location: Belgium
Completion: 2017 (EPCM)
Investment cost: 65m€

 

Project description

F4PE is implementing new production units in an existing and unused building, in partnership with Talboom
Increase current capacity from 34 million to 56 million doses
Re-purpose the building to the best fit for long term production and incorporate process improvement

 

Services provided

Services provided:
Conceptual design by CRB with local assistance by F4PE.
Basic Design by F4PE and EPCM with Talboom: for F4PE PM, CM, Qualification Management, Process utilities and Process Equipment, HVAC, Cost estimation

 

Packages under F4PE responsibility

  • Clean Services (PW, WFI, PS, CAP, NaOH)
  • HVAC
  • Process Equipments:
  • Autoclaves
  • Washing machines
  • Chromatography column and Control Tower
  • Ultrafiltration
  • Media Preparation vessels (4p)
  • Media Hold vessels (4p)
  • Pooling & Clarification vessels
  • Buffer Hold Vessel
  • Inactivation vessels (3p)
  • Final Filtration vessel